• Last Update 2024-07-01 18:34:00

Cinnamon Lakeside partial shutdown for repairs

Business

Cinnamon Lakeside will be closed partially (for about seven months) resulting in at least 40 per cent of the rooms unavailable while work is carried out on its pergolas for emergency health and safety repairs, Cinnamon Hotels GM Rohan Karr said. However all the public areas in the hotel including the restaurants will be open and operate as usual while the balance rooms will also be occupied. An announcement to the Colombo Stock Exchange on Monday said the hotel will be partially closed from today (March 30) to October 2015 (seven months). The 30-year old hotel requires such renovations and sections of its rooms would be closed during the time period these repairs are carried out. During this period 30-40 per cent of the 346 rooms would be made unavailable, he explained, adding that this is even though there is no work inside the rooms. The exterior of the hotel on the balconies or pergolas of the bedrooms require repair work, Mr. Kaar said adding that “we don’t compromise on health and safety at any cost.” The cost of the repairs would be around Rs.380 million. This work was unlikely to cause any noise disturbance to the guests staying at the hotel during this time, Mr. Karr said. Cinnamon Lakeside during its last winter season had about 60 per cent occupancy. (SD)    

You can share this post!

Comments
  • Still No Comments Posted.

Leave Comments